Menu
Sign In Search Podcasts Charts People & Topics Add Podcast API Pricing
Podcast Image

ELECTRIFY™ | Electrician Podcast

Let’s Ask Paul | Episode 151 | MC Supports, Digital Electricity, MC and Heavy Timber

16 Oct 2023

Description

Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, as he answers more questions from the Let’s Ask Paul Portal over at www.PaulAbernathy.com.In this episode, Paul will tackle the questions submitted by a listener. The topic covered in this episode is about supporting MC Cable in a wall after the building is finished, also a great discussion on digital electricity, where I quoted the wrong standards for Class 4 Fault Managed Systems and Associated cables which are UL 1400-1 and 1400-2 and installing MC Cable in a heavy timber application. I also address a question in the end about locknuts and bushings when doing pull box calculations.If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.

Audio
Featured in this Episode

No persons identified in this episode.

Transcription

This episode hasn't been transcribed yet

Help us prioritize this episode for transcription by upvoting it.

0 upvotes
🗳️ Sign in to Upvote

Popular episodes get transcribed faster

Comments

There are no comments yet.

Please log in to write the first comment.