Podcast Appearances
So I think as Simon said in the interview, I think this was 13 months, 14 months to build it.
And it would have taken about three years if it was sort of traditional bricks and mortar.
But the whole thing is that you could just sort of spec it up.
It essentially arrives on the back of a lorry.
It's a bit more to it than that.
And they sort of plonk it down and it's all modular.
So it's just a much faster way of doing it.
This was basically a car park.
before this data center appeared here.
And yeah, I think it's just about the sheer speed.
And I mean, the amount of power, the amount of GPUs and computing power just in this space, it's quite incredible.
Yeah, yeah, absolutely, yeah.
So the cool thing is, and I'll open this door again because I like that I can keep doing this.
So yeah, as he said, so we have multiple blades in this rack.
I think it was something like 55.
I'm looking down to my producer, Harry, just to double check.
55, he gives me a thumbs up.
So 55 blades in here.
Each of the blades has eight GPUs in them.
They're all water-cooled.