Menu
Sign In Search Podcasts Charts People & Topics Add Podcast API Pricing
Podcast Image

AEMO On Air

Building the 2026 ISP: developing a very different Integrated System Plan in 2026

26 Aug 2025

Description

In July we hit the half-way mark in the development of the 2026 Integrated System Plan (ISP) with the publication of a number of key reports, including the Inputs, Assumptions and Scenarios Report (IASR) and the new Gas Infrastructure Options Report (GIOR).The ISP is the strategic roadmap for Australia's National Electricity Market (NEM) and it outlines the investment and infrastructure required to meet government emissions and renewable energy targets and keep the lights on and the gas flowing.In this episode of AEMO On Air, we talk to AEMO's outgoing EGM System Design, Merryn York (AM) about the development of the ISP and how the 2026 ISP will be different to the 2024 edition, including new gas considerations as well as consumer energy resources.Merryn shares her rich experience and deep understanding of key issues, such as the role of government policy in the ISP as well as how consumers and new technologies are factored and modeled in this important report.Read more about the 2026 ISP here: http://bit.ly/3VpxKc5Interviewer: Catie LowLinkedIn | X | Facebook

Audio
Featured in this Episode

No persons identified in this episode.

Transcription

This episode hasn't been transcribed yet

Help us prioritize this episode for transcription by upvoting it.

0 upvotes
🗳️ Sign in to Upvote

Popular episodes get transcribed faster

Comments

There are no comments yet.

Please log in to write the first comment.