Menu
Sign In Search Podcasts Charts People & Topics Add Podcast API Pricing
Podcast Image

Built Modular by BOXX Modular

Did You Know This About Modular Construction?

23 Sep 2020

Description

A lack of information about today’s modular buildings can lead to a lot of confusion, misconceptions and missed opportunities regarding a sustainable, cost-effective solution. BOXX Modular's Senior Vice President of Marketing Services, Mark Meyers, joined the Built Modular podcast to dispel myths and provide answers that people should know when it comes to modular construction.While many people might think the typical way of obtaining temporary modular construction is to lease a building, Meyers noted many custom and permanent modular building projects are purchased. An even lesser-known, but viable option for people is "lease to own."“This option is a fantastic way to reduce the amount of initial capital that needs to be put out for a project and still end up owning the building,” Meyers said.What about costs for the various options for a typical new modular building project? The base leasing price ranges from $1-$1.50 per square foot per month. This pricing does not include delivery, on-site assembly or project completion tear-down costs.“Customized modular projects tend to be purchases,” Meyers said.Those ranges can vary depending on the myriad factors of the design needs.  Meyers provided a ballpark purchase price range between $100-$300 per square foot, not including delivery and installation.Meyers said modular construction shares many similarities with traditional building processes. However, unlike conventional construction projects, modular buildings are built in sections off-site and delivered to the site destination and then assembled. And one of the things Vanguard Modular does is keep track of each state’s building codes and regulations.“All of those calculations are carefully put together and engineered in the design of the building to ensure that the structure does meet those codes before those buildings are moved out from the manufacturing facility and installed on the site," Meyers said.

Audio
Featured in this Episode

No persons identified in this episode.

Transcription

This episode hasn't been transcribed yet

Help us prioritize this episode for transcription by upvoting it.

0 upvotes
🗳️ Sign in to Upvote

Popular episodes get transcribed faster

Comments

There are no comments yet.

Please log in to write the first comment.