Contractors Corner by Solar Power World
The Case for Solar: Developing a multi-project solar portfolio
02 Sep 2021
Fulfilling development tasks, arranging an interconnection agreement and designing and then building a solar array is no simple task. But Oakland, California-based solar developer Adapture Renewables did it 10 times over when it acquired a portfolio of projects planned for Western Oregon. In the third episode of The Case for Solar, associate editor Billy Ludt narrates his case study written for the September 2021 issue of Solar Power World. Read the case study here: solarpowerworldonline.com MUSIC "Himalayas" by Mona Wonderlick โ bit.ly/youtube-monawonderlick Creative Commons โ Attribution 3.0 Unported โ CC BY 3.0 Free download: bit.ly/himalayas-download
No persons identified in this episode.
This episode hasn't been transcribed yet
Help us prioritize this episode for transcription by upvoting it.
Popular episodes get transcribed faster
Other recent transcribed episodes
Transcribed and ready to explore now
3ยช PARTE | 17 DIC 2025 | EL PARTIDAZO DE COPE
01 Jan 1970
El Partidazo de COPE
13:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
12:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
10:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
13:00H | 20 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
12:00H | 20 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana