Project managers have traditionally measured the viability of a project design or materials choice as a triangle, balancing cost, scope and performance. With the addition of carbon, this triangle becomes a three-sided pyramid, with four considerations each interacting with the others. Materials suppliers and project designers now have a wealth of carbon cutting innovations available to them. They can use materials derived from plant sources, replace fossil fuels used in materials processing, and use electric vehicles for delivery. The challenge is to show clients the carbon benefits of these innovations, while continuing to be mindful of cost, scope and performance. In this episode, we talk to two experts about the tools and methods available to assess carbon cutting innovations, and to compare them using the new project management pyramid. Guests Jessica Tuck, National Technical Director, UK, Tarmac Tim Smith, Regional Technical Manager, South, Tarmac Partner Tarmac is the UK’s leading sustainable construction materials, road contracting and building products business. It leads in the supply of construction material comprising aggregates, asphalt, cement, lime, concrete, road contracting, building products and recycling services.The post #291 Making the Case for Cutting Carbon first appeared on Engineering Matters.
No persons identified in this episode.
This episode hasn't been transcribed yet
Help us prioritize this episode for transcription by upvoting it.
Popular episodes get transcribed faster
Other recent transcribed episodes
Transcribed and ready to explore now
3ª PARTE | 17 DIC 2025 | EL PARTIDAZO DE COPE
01 Jan 1970
El Partidazo de COPE
13:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
12:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
10:00H | 21 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
13:00H | 20 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana
12:00H | 20 DIC 2025 | Fin de Semana
01 Jan 1970
Fin de Semana