CRB, we're generally around three to six months on those barrels, which is stainless steel.
And barreled actions, that usually takes us to the 12 to 14 week range as well.
Because a lot of the times it's waiting for the carbon barrel.
If you do carbon, sometimes it's getting the action.
And especially if it's something that's not on our regular carried, like if you call in, we do an invoice.
We get something that we don't normally buy.
definitely the lead times are going to be longer.
Now, if it's stuff we have in stock, like the Black Rain Derricos, and we have the barrel here, you're going to be about four to five weeks right now.
Just the load, like Cole said, we had a lot of orders.
So the shelf's really stacked full of orders to get filled.
It's just putting a lot of time on the machine shop right now.
So that's about where we're at with those.
And full builder rifles, you can usually expect around three to five months.
Like a big thing with heavy Palmas that we've talked about quite a bit this time is we're usually going to call you up, say, okay, you know, I got an M24, which that one's a straight contour instead of the swoop after the chamber.
It's the same weight, basically the same barrel.
The thing is, is know what your barrel channel is going to be in your stock as well, just to make sure.
These are going to fit because we're going to ask you that, you know, same weight, everything else.
This one, we'll get it on there.
It's going to be out in a few weeks as opposed to waiting another month and a half for it.
So just really think about that a lot.