The utilities have gotten a lot smarter.
But when we're going into these, again, tertiary, non-traditional data center markets, these utilities didn't have 20 megawatt, 50 megawatt, and then 100 megawatt data centers.
They're getting like a three or four gigawatt campus out of the blue like that.
And I think that's created a little bit of some challenges.
Sure.
Again, this is a bit of a rabbit hole.
But no, I think we've seen it at a very large scale with the hyperscalers trying to either do sort of a joint venture or an acquisition of the power that's coming from these large reactors.
I think a lot of folks want to know about the SMR story.
I think that the U.S.
is closer to having those rolled out.
The challenge is, Raymond, if you think about, you know, the guys that show up or the folks that show up, rather, it's a protest.
The data center is being built.
If you think the woman that's mad because she's walking her schnauzer and they put a big, ugly building up, that's like the worst thing that's going to happen.
Well, what I was going to say is, wait until she hears they're putting a small modular reactor inside and see how she flips it.
She'll be fine.
It's OK.
I'm very pro-nuclear for sure.
I think a lot of these things today exist in pretty much test environments.
But you're a military man, correct?
These things have been floating around the oceans in submarines with little to no detrimental to service for decades.