Yeah.
Right.
And so for what we see is the need is to create
a group that will start to actually test this out to see how will this be a fulfillment.
Because I think it's actually going to be better to take 480 to go to the 800 volt DC.
There's so much already existing.
It's a way to implement that faster than trying to take it from the medium voltage and drop it down.
But, you know, those will have its own challenges because you still have the 800-volt DC to come in with.
So we're looking at, okay, how are there other ways that we can support speed?
And when you have these massive construction applications where you're building out something that's 300 megawatts and you're going to have, what, 10, 20 megawatt data hall blocks,
Exactly.
But, you know, it's like one of the things that was being told to us that we were looking at was, boy, it would be great if we had a mobile substation that would allow us to be able to bring in that transformer and breaker combination to help do the commissioning on that building block as it's being built while they're still waiting on the grid connection.
So we actually have something now that we're going to be announcing here at PowerGen, which is a mobile substation.
You need that 230 kV breaker and 50 MVA transformer?
We'll be able to provide that and now be able to give you that application to support you.
So you can start commissioning the block.
as you've built it, and move it down.
And if you need to move that to another location, now you can go to the next location with that same.
Okay.
And then you get into training.