The first three are analyzed at a more detailed project level in the EIR, and the remaining components are analyzed at a more general programmatic level.
This slide shows the Martin substation area in more detail.
The blue box on the left would be the location of either the construction staging area for Martin substation separation.
or the project variant, which would be a new substation.
In the responses to comments document, the project description was refined.
to slightly expand the Martin Substation separation project site.
As you see here from the red dash line, approximately a hundred and fifty feet west to the pink' line.
The project was also revised to add a potential construction staging area within the Balin site on the top right of the figure.
Appellants raise a wide variety of issues, all of which are addressed in detail in our written response.
Broadly, our responses fall into four categories, which I'll focus on in my presentation.
Project description refinements do not create new or substantially more severe impacts.
Revisions made to in the responses to Comments document do not constitute significant new information requiring recirculation.
The EIR's impact analysis is supported by substantial evidence, and the Planning Department followed all required CEQA and City Administrative Code Chapter thirty one procedures accurately and appropriately.
Appellants claim a different
Project version in the California Public Utilities Commission valuation process invalidates the CEQA project description.
This is not true.
The EIR adequacy is related to how well it evaluates the project described in the EIR.
Other regulator regulatory project versions are irrelevant here.
The EIR includes both project specific and programmatic components and analyzes each at an appropriate level of detail.
Appellants claim all components should be have been analyzed at a project level, but CEQA allows agencies to choose the appropriate level based on the available information, and the EIR follows this standard.