The low-confidence
Parcel itself is very narrow. low-confidence
It's about 36 feet wide on average and about approximately a little over 800 square feet long. low-confidence
I'm sorry, 800 feet long. low-confidence
This is the existing uh area of which the site will be developed. low-confidence
Um you see this is taken f looking south um from the edge of the uh Mary Avenue dock park. low-confidence
And this is a civil drawing of the area. low-confidence
Um you can see because of the length of the parcel it have you broke up in two. low-confidence
Uh the top half the top uh is uh the northern half, the bottom is the southern half. low-confidence
You can see the dotted um the dotted lines are essentially the area which will be um low-confidence
affected by the project in terms of uh um roadway reconfiguration. low-confidence
Um the darker area above the parking is where the approximately where the um the low-confidence
through sidewalk will be as well as uh bike lanes and whatnot. low-confidence
Um the red areas is the parcel line. low-confidence
So this is where the buildings will go. low-confidence
This is the the city owned parcel and that is uh proposed for the development. low-confidence
So uh overall the rightway modifications will necessitate a net loss of approximately eighty nine parking spaces. low-confidence
Um low-confidence
The parking space on the west side of the Mary Avenue will be parallel. low-confidence
However, parking on the east side of Mary Avenue and uh uh directly across uh from the project will be removed. low-confidence