Ray Wang
speaker
2,187 appearances
15 recordings
1 series
first heard Dec 2025
last heard 15 Sep
Ray Wang’s voice in public audio — every appearance, attributed to the second.
Trend
recordings per month · last 12 monthsRecordings per month over the last 12 months — 15 in all, peaking in Sep 2026 with 2.
Appearances
The
low-confidence
Parcel itself is very narrow.
low-confidence
It's about 36 feet wide on average and about approximately a little over 800 square feet long.
low-confidence
I'm sorry, 800 feet long.
low-confidence
This is the existing uh area of which the site will be developed.
low-confidence
Um you see this is taken f looking south um from the edge of the uh Mary Avenue dock park.
low-confidence
And this is a civil drawing of the area.
low-confidence
Um you can see because of the length of the parcel it have you broke up in two.
low-confidence
Uh the top half the top uh is uh the northern half, the bottom is the southern half.
low-confidence
You can see the dotted um the dotted lines are essentially the area which will be um
low-confidence
affected by the project in terms of uh um roadway reconfiguration.
low-confidence
Um the darker area above the parking is where the approximately where the um the
low-confidence
through sidewalk will be as well as uh bike lanes and whatnot.
low-confidence
Um the red areas is the parcel line.
low-confidence
So this is where the buildings will go.
low-confidence
This is the the city owned parcel and that is uh proposed for the development.
low-confidence
So uh overall the rightway modifications will necessitate a net loss of approximately eighty nine parking spaces.
low-confidence
The parking space on the west side of the Mary Avenue will be parallel.
low-confidence
However, parking on the east side of Mary Avenue and uh uh directly across uh from the project will be removed.
low-confidence
Showing 1461–1480 of 2,187 · page 74 of 110
← Previous
Next →